![](https://gpdcontracts.com/wp-content/uploads/2017/12/GPD_Astwood-Bank-Primary-school-Redditch.jpg)
EWI & Cedar cladding package provided in Redditch
1st December 2017![](https://gpdcontracts.com/wp-content/uploads/2017/12/Heat-loss-Home.jpg.jpg)
Heat loss in your home
1st December 2017The project is a metal frame construction with factory made timber insulated panels. Further to this 200mm of Wetherby Cavity rail Epsitec EPS Insulation system was applied, finished in White Silicone K 1.5mm.
The cladding package provided by GPD also included supply and installation of the vertical secret fix PPC Aluminium plank profile blue, white & green to symbolise the schools colours.